Summary
TransAlta is hiring two Hydro Generation Operator I employees for its Hydro System Control Centre in Calgary. The role remotely monitors and operates hydroelectric facilities, carries out generation dispatch, manages water and responds to alarms and emergencies. The position is full-time, on-site and unionized, with rotating 12-hour day and night shifts. Applicants need a C.E.T. qualification in a related technical discipline or electrical or instrumentation journeyperson certification; power generation or control centre experience is preferred.
Sign up free to read the full posting.
The employer's posting, the pay, the skills and the way to apply are all there. It takes a minute, and it stays free.